Sriwidiati (2010) Analisa penjadwalan proyek untuk menentukan probabilitas penyelesaian proyek: studi kasus proyek pembangunan rumah mewah di Istana Dieng Malang oleh Sriwidiati. Diploma thesis, Universitas Negeri Malang.
Full text not available from this repository.Abstract
Schedulingo fproject representso ne ofthe important aspecto fpfanning. At project planning of schedule and compilation of activity specified pursuant to estimat(ef eelinge ngineering)I.n the planningp rocessa lwaysc anb e considered thee xistingp ossibilitiesb ecausejt canb e ascertainetdh at not all estimationw ill be precise. At this thesis we learn about scheduling of project with PERT method usingt hreet ime estimatest hat is optimism time (a) pessimistt ime (b) and the most likely time (m). The three time estimates is used to determine probability durationo fproject. The arralysis result of PERT method irdicates that tota.l duration of luxuriant house development project at Dieng Palace Malang is 203 34 days. While value possibility of project finish at goals (Td 230 days) close to 100%.
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | Q Science > QA Mathematics |
Divisions: | Fakultas Matematika dan IPA (FMIPA) > Departemen Matematika (MAT) > S1 Matematika |
Depositing User: | library UM |
Date Deposited: | 10 Aug 2010 04:29 |
Last Modified: | 09 Sep 2010 03:00 |
URI: | http://repository.um.ac.id/id/eprint/17818 |
Actions (login required)
View Item |